Genco Oil OSInternal Group

Overview

Dashboard

Mock plastics pyrolysis operations with no login and no database dependency.

Feedstock Run Rate

72 t/day

89% uptime

Secured Supply

60%

1,460 / 2,440 t per month

Oil Output

45.4 t/day

63% yield

Monthly EBITDA

$395,000.00

Mock operating case

Line Status

Current operating modules

Pre-sort and densification

Feed preparation

steady
Bias 1.04x

Reactor train A

Thermal conversion

steady
Bias 1.00x

Condenser bank

Vapor recovery

ramping
Bias 0.96x

Oil polishing skid

Product finishing

steady
Bias 0.93x

Inbound Queue

1 cleared lots in the current mock cycle

LOT-240618-A

91% LDPE / 9% LLDPE

cleared
18 tons4.9% contaminationETA 08:10

LOT-240618-B

74% PP / 26% PE

sampling
14 tons2.7% contaminationETA 09:40

LOT-240618-C

Mixed flexibles

quarantined
11 tons8.3% contaminationETA 11:25

Output Streams

Mock commercial split for the active case

Pyrolysis oil

Marine fuel and cracker blendstock

$238.00/t

Offtake: Eastern Seaboard Fuels

Recovered carbon char

Brick, asphalt, and carbon additive applications

$112.00/t

Offtake: Siam Carbon Materials

Recovered process gas

Offsets burner fuel and parasitic energy load

$68.00/t

Offtake: Internal utility loop

Recent Events

Plain mock trace log

Supplier declaration locked

06:55

Bangkok Metro Recovery Hub batch signed with polymer composition and contamination band.

Weighbridge and sample capture

08:12

Inbound lot photographed, weighed, and linked to receiving QR token.

Reactor charge approved

10:05

Quality gate confirmed chlorine threshold below partner demo control limit.

Product tank release

14:40

Pyrolysis oil transferred to TK-PO-03 with yield and density record attached.

Supply Base

Current mock supplier pool

Bangkok Metro Recovery Hub

BangkokLDPE film and retail wrap

820 t/mo

secured

Chonburi Industrial Scrap Pool

ChonburiPP purge and mixed packaging scrap

640 t/mo

secured

Rayong Circular Materials Co-op

RayongMixed flexibles with washed PE fraction

510 t/mo

pilot

Laem Chabang Port Logistics Cluster

ChonburiStretch film and warehouse overwrap

470 t/mo

negotiating

Commercial Case

Balanced Ramp

Revenue

$1,360,000.00

CO2e Avoided

22,800 t/year

Payback

3.8 years