Supplier to production
A public, partner-ready pyrolysis control room inside the existing FE.
Stable startup profile designed to prove conversion efficiency and fast plant commissioning.
Feedstock run rate
72
tons/day converted
Monthly EBITDA
$395,000.00
mock economics, demo only
CO2e avoided
22,800
tons/year equivalent
Demo narrative
Use these talking points while walking a partner through the flow.
Commercial wedge
Municipal + commercial film waste
Payback signal
3.8 years
Secured supply coverage
60%
1,460 of 2,440 monthly tons under signed control.
Average contamination band
4.8%
Pre-sort and wash contracts keep chlorine and moisture risk within the demo operating window.
Current line uptime
89%
Mock operating point built for a clean partner walkthrough, not plant historian data.
Oil basket yield
63%
45.4 tons/day of saleable oil under the selected scenario.
Line architecture
A clean visual flow for the partner story: feedstock in, hydrocarbons out.
Feed prep
Sort, shred, densify mixed plastics
Thermal conversion
Continuous reactor at 412C
Condensing
Cut tuned at 126C for oil recovery
Offtake
Tank release into contracted dispatch window
Scenario economics
Headline numbers for the selected operating profile.
Monthly revenue
$1,360,000.00
Monthly EBITDA
$395,000.00
Oil output per day
45.4 tpd
Char output per day
15.1 tpd
Energy gas recovery
11.5 tpd
Annual CO2e avoided
22,800 t